Tuesday, 3. 9. 2019

Renovated steps leading to the Na stolbi Street

The renovation of the concrete steps above the southern portal of the castle tunnel – the footpath from Krek Square to the Na stolbi Street concluded the first maintenance phase of the area at Na stolbi Street.

At the same time we renovated the lower part of the footpath to the castle – Bends (Ovinki) leading from the Na stolbi Street to the castle. A section of the path severely damaged by hinterland waters from the hill was reconstructed into a wooden staircase on steel pylons following the design on the Student Path (Študentovska steza).